Canada–Nova Scotia Offshore Area Petroleum Operations Framework Regulations (SOR/2024-26)

Regulations are current to 2024-05-01

PART 12Notice, Records, Reports and Other Information for Authorized Works and Activities (continued)

General (continued)

The following provision is not in force.

Marginal note:Safety report

  • The following provision is not in force.

     (1) An operator must ensure that a safety report that relates to an authorized work or activity conducted in a given calendar year is submitted to the Board within 90 days after the day on which the work or activity is concluded or suspended or, in the case of a work or activity that will continue into the following calendar year, that a safety report that relates to the work or activity conducted in the preceding calendar year is submitted to the Board not later than March 31 of that following calendar year.

  • The following provision is not in force.

    Marginal note:Requirements

    (2) The safety report must contain

    • The following provision is not in force.

      (a) a description and analysis of the efforts undertaken to improve safety;

    • The following provision is not in force.

      (b) a summary of the operator’s safety performance during the applicable calendar year, including with respect to the objective of reducing safety risks;

    • The following provision is not in force.

      (c) a summary of the safety measures and actions taken to mitigate the effects of any reportable incident, as well as of their effectiveness and any adjustments made for their continued improvement; and

    • The following provision is not in force.

      (d) a summary of any emergency response drills and exercises relating to safety that were completed.

The following provision is not in force.

Marginal note:Annual reports

 An operator must ensure that the Board is made aware, at least once a year, of any report containing relevant information regarding applied research work or studies that the operator has participated in, funded or commissioned concerning the operator’s authorized works and activities in relation to safety, the protection of the environment or resource management and must ensure that a copy of the report is submitted to the Board on request.

Geoscientific, Geotechnical and Environmental Programs

The following provision is not in force.

Marginal note:Notice — key dates

 When any geoscientific program, geotechnical program or environmental program is commenced, concluded, suspended or cancelled by an operator, the operator must, without delay, notify the Board in writing of the date of the commencement, conclusion, suspension or cancellation of the program.

The following provision is not in force.

Marginal note:Weekly status reports

  • The following provision is not in force.

     (1) An operator must ensure that weekly reports are submitted to the Board on the status of field work carried out in relation to any geoscientific program, geotechnical program or environmental program from the commencement of the program until its conclusion, suspension or cancellation.

  • The following provision is not in force.

    Marginal note:Content of reports

    (2) The weekly status reports must contain the following documents and information:

    • The following provision is not in force.

      (a) the program number assigned by the Board;

    • The following provision is not in force.

      (b) information identifying, and indicating the current location and status of, all operations sites and support craft used in the program;

    • The following provision is not in force.

      (c) key dates of the works and activities under the program, in particular their commencement, suspension and completion dates,

    • The following provision is not in force.

      (d) a description of the works and activities carried out during the preceding week, including

      • (i) the quantity of data collected, broken down by data acquisition technique,

      • (ii) information identifying and indicating the location of data collection points, lines or areas,

      • (iii) a schedule indicating each type of work or activity carried out under the program, as well as any period in which data acquisition was delayed or interrupted, along with a summary of the causes of that delay or interruption, and

      • (iv) a description of any failure to comply with a condition of the authorization;

    • The following provision is not in force.

      (e) maps illustrating, in relation to the proposed data acquisition plan referred to in subparagraph 8(i)(iii), the portion of the data acquisition that has been completed, the portion that was completed in the preceding week and the portion that remains to be carried out;

    • The following provision is not in force.

      (f) an indication of the total number of persons involved in the program who, during the preceding week, were at, or transferred to or from, the operations sites and, if applicable, the means by which they were transferred;

    • The following provision is not in force.

      (g) a summary of any communications or interactions that occurred during the preceding week concerning program activities between persons associated with the program and persons associated with fishing activities;

    • The following provision is not in force.

      (h) a summary of emergency drills and exercises that were completed and reportable incidents that occurred during the preceding week;

    • The following provision is not in force.

      (i) an indication of the quantities of consumable substances that are critical to safety that are currently at each operations site;

    • The following provision is not in force.

      (j) all wildlife observation data from the preceding week that were required to be recorded under paragraph 181(1)(e);

    • The following provision is not in force.

      (k) a summary of the verification, inspection, monitoring, testing, maintenance and operating activities that are critical to safety that were carried out during the preceding week; and

    • The following provision is not in force.

      (l) a description of any measures taken during the preceding week to avoid disturbing wildlife or interfering with fishing activities or any other uses of the sea.

The following provision is not in force.

Marginal note:Environmental report — programs

 An operator must ensure that an environmental report that contains the following documents and information is submitted to the Board within 90 days after the day on which a geoscientific program, geotechnical program or environmental program is concluded or suspended:

  • The following provision is not in force.

    (a) a description of the general physical and environmental conditions under which the program was conducted and, if applicable, a description of ice management activities and non-productive time caused by meteorological or ice conditions;

  • The following provision is not in force.

    (b) a summary of program performance in relation to the environment, including with respect to the objective of reducing environmental risks;

  • The following provision is not in force.

    (c) a summary of environmental protection measures and actions that were taken to mitigate the effects of any reportable incident, as well as of their effectiveness and any adjustments made for their continued improvement;

  • The following provision is not in force.

    (d) a summary of any emergency response drills and exercises for the protection of the environment that were completed; and

  • The following provision is not in force.

    (e) all wildlife observation data that were required to be recorded under paragraph 181(1)(e).

The following provision is not in force.

Marginal note:Final reports

  • The following provision is not in force.

     (1) An operator must ensure that a final operations report, final data processing report and final interpretation report are submitted to the Board with the acquired data referred to in subsection (5), as applicable, within 12 months after the day on which any geoscientific program, geotechnical program or environmental program is concluded, unless a longer period has been agreed to in writing by the Board.

  • The following provision is not in force.

    Marginal note:Content of final operations report

    (2) The final operations report must contain the following documents and information:

    • The following provision is not in force.

      (a) the program number assigned by the Board;

    • The following provision is not in force.

      (b) the title, author and date of the report;

    • The following provision is not in force.

      (c) an executive summary and table of contents;

    • The following provision is not in force.

      (d) the names of the operator, contractors and any interest owner, as defined in section 49 of the Act;

    • The following provision is not in force.

      (e) a description of all operation sites and any support craft used for the program;

    • The following provision is not in force.

      (f) a description of the program, including

      • (i) key dates, in particular its commencement, suspension and completion dates,

      • (ii) the equipment used,

      • (iii) the operational methods employed,

      • (iv) the number of persons who were involved in the program, and

      • (v) the quantity of data collected, broken down by data acquisition technique;

    • The following provision is not in force.

      (g) location maps illustrating details of the data acquisition activities carried out under the program, including the identification and location of data collection points, lines or areas and the type of data acquired;

    • The following provision is not in force.

      (h) location maps illustrating the boundaries of each area covered by the program and any portion of those areas that is subject to an interest, as defined in section 49 of the Act, as well as the identification number of each such interest;

    • The following provision is not in force.

      (i) a schedule that specifies the type and duration of all program activities and includes any period in which data acquisition was delayed or interrupted;

    • The following provision is not in force.

      (j) an indication as to the accuracy of the navigation system and of the positioning and survey systems, as well as the parameters and configuration of both the energy source and recording system; and

    • The following provision is not in force.

      (k) shotpoint maps, track plots, flight lines with numbered fiducial points, gravity station maps, location maps for any samples or core holes, copies of any photographs and a list of any videos.

  • The following provision is not in force.

    Marginal note:Content of final data processing report

    (3) The final data processing report must contain the following documents and information:

    • The following provision is not in force.

      (a) the documents and information referred to in paragraphs (2)(a) to (d), (g) and (k);

    • The following provision is not in force.

      (b) a description of the program, including the quantity of data collected, broken down by data acquisition technique; and

    • The following provision is not in force.

      (c) a description of the geoscientific data acquired, including the data processing sequence and parameters.

  • The following provision is not in force.

    Marginal note:Content of final interpretation report

    (4) The final interpretation report must contain the following documents and information, as applicable:

    • The following provision is not in force.

      (a) the documents and information referred to in paragraphs (2)(a) to (e);

    • The following provision is not in force.

      (b) bathymetric or topographic maps compiled from the data collected;

    • The following provision is not in force.

      (c) a description and interpretive maps of the acquired data, including

      • (i) time and depth structure and isopach maps, velocity and residual velocity maps and seismic attribute maps,

      • (ii) final Bouguer gravity maps and any residual or other processed gravity maps,

      • (iii) final total magnetic intensity contour maps and any residual, gradient or other processed magnetic maps,

      • (iv) final controlled-source electromagnetic resistivity maps,

      • (v) surficial maps generated from any seabed, geohazard or pipeline route survey, and

      • (vi) any geological maps;

    • The following provision is not in force.

      (d) a description and analysis of the interpretation of the data with respect to

      • (i) geological and geophysical correlations,

      • (ii) correlations between gravity, magnetic, seismic and controlled-source electromagnetic data, including correlations to any data acquired during previous surveys,

      • (iii) in the case of seabed surveys, the geophysical correlation between shallow seismic data and data from cores and geotechnical boreholes,

      • (iv) corrections or adjustments that were applied to the data during processing or compilation,

      • (v) the velocity information that the operator used in a time-to-depth conversion,

      • (vi) cores and samples,

      • (vii) other geoscientific and geotechnical analyses, and

      • (viii) geohazards; and

    • The following provision is not in force.

      (e) a description of

      • (i) synthetic seismograms,

      • (ii) seismic modelling studies that use synthetic seismograms,

      • (iii) vertical seismic profiles at wells that were used in the interpretation of the data,

      • (iv) amplitude versus offset studies,

      • (v) seismic inversion studies, if any, and

      • (vi) any other seismic studies related to the program.

  • The following provision is not in force.

    Marginal note:Acquired data

    (5) The following acquired data must accompany the final reports, as applicable:

    • The following provision is not in force.

      (a) time-stamped track plot, shotpoint and sample location data;

    • The following provision is not in force.

      (b) bathymetric data;

    • The following provision is not in force.

      (c) all final processed seismic data for each 2-D seismic line in time and depth;

    • The following provision is not in force.

      (d) all final processed 3-D volumes and each line generated from that volume in time and depth;

    • The following provision is not in force.

      (e) any vertical seismic profiles, synthetic seismograms, amplitude versus offset data and seismic inversion data;

    • The following provision is not in force.

      (f) in the case of any seabed, geohazard or pipeline route survey,

      • (i) processed high-resolution data for each line,

      • (ii) digital location maps for any samples,

      • (iii) any photographs and videos, and

      • (iv) sub-bottom profiler and side-scan sonar data;

    • The following provision is not in force.

      (g) in the case of an environmental program, any photograph, video or other graphic information that is relevant and contributes to the interpretation of the final data and the drafting of the final report;

    • The following provision is not in force.

      (h) in the case of a gravity or magnetic survey, a series of gravity and magnetic profiles across all gravity and magnetic surveys; and

    • The following provision is not in force.

      (i) in the case of controlled-source electromagnetic data, final processed cross-sections on all receiver lines, curves from all receivers and all 2-D and 3-D final models generated.

  • The following provision is not in force.

    Marginal note:Incorporation of previous data

    (6) The operator must incorporate into any map referred to in paragraph (4)(b) that is included in a final interpretation report any data previously collected by the operator that are related to the area covered by the map and that are of a type similar to the data from which the map was produced.

 