<?xml version="1.0"?><Regulation lims:pit-date="2020-03-16" hasPreviousVersion="true" lims:lastAmendedDate="2020-03-16" lims:current-date="2020-11-17" lims:inforce-start-date="2019-12-02" lims:enacted-date="2019-12-02" lims:fid="1206623" lims:id="1206623" gazette-part="II" regulation-type="SOR" xml:lang="en" xmlns:lims="http://justice.gc.ca/lims"><Identification lims:inforce-start-date="2019-12-02" lims:enacted-date="2019-12-02" lims:fid="1206624" lims:id="1206624"><InstrumentNumber>SOR/2019-347</InstrumentNumber><RegistrationDate><Date><YYYY>2019</YYYY><MM>12</MM><DD>2</DD></Date></RegistrationDate><ConsolidationDate><Date><YYYY>2020</YYYY><MM>11</MM><DD>18</DD></Date></ConsolidationDate><EnablingAuthority lims:inforce-start-date="2019-12-02" lims:enacted-date="2019-12-02" lims:fid="1206625" lims:id="1206625"><XRefExternal reference-type="act" link="C-15.1">CANADIAN ENERGY REGULATOR ACT</XRefExternal></EnablingAuthority><LongTitle lims:inforce-start-date="2019-12-02" lims:enacted-date="2019-12-02" lims:fid="1206626" lims:id="1206626">International and Interprovincial Power Line Damage Prevention Regulations — Authorizations</LongTitle></Identification><Order lims:inforce-start-date="2019-12-02" lims:enacted-date="2019-12-02" lims:fid="1206627" lims:id="1206627"><Provision lims:inforce-start-date="2019-12-02" lims:enacted-date="2019-12-02" lims:fid="1206628" lims:id="1206628" format-ref="indent-0-0" language-align="yes"><Text>The Canadian Energy Regulator, pursuant to subsections 272(4) and 275(2) of the <XRefExternal reference-type="act" link="C-15.1">Canadian Energy Regulator Act</XRefExternal><FootnoteRef idref="fn_81000-2-3619_hq_25379">a</FootnoteRef> makes the annexed <XRefExternal reference-type="regulation" link="SOR-2019-347">International and Interprovincial Power Line Damage Prevention Regulations — Authorizations</XRefExternal>.</Text><Footnote id="fn_81000-2-3619_hq_25379" placement="page" status="official"><Label>a</Label><Text>S.C. 2019, c. 28, s. 10</Text></Footnote></Provision><Provision lims:inforce-start-date="2019-12-02" lims:enacted-date="2019-12-02" lims:fid="1206629" lims:id="1206629" format-ref="indent-0-0" language-align="yes"><Text>Calgary, November 25, 2019</Text></Provision><Provision lims:inforce-start-date="2019-12-02" lims:enacted-date="2019-12-02" lims:fid="1206630" lims:id="1206630" format-ref="indent-0-0" language-align="yes" topmarginspacing="12"><TableGroup lims:inforce-start-date="2019-12-02" lims:enacted-date="2019-12-02" lims:fid="1206631" lims:id="1206631" bilingual="yes" orientation="portrait" pointsize="11pt" topmarginspacing="50pt"><table lims:inforce-start-date="2019-12-02" lims:enacted-date="2019-12-02" lims:fid="1206632" lims:id="1206632" frame="none"><tgroup lims:inforce-start-date="2019-12-02" lims:enacted-date="2019-12-02" lims:fid="1206633" lims:id="1206633" cols="2"><colspec colname="1" colwidth="100*" /><colspec colname="COLSPEC0" colwidth="100.00*" /><tbody lims:inforce-start-date="2019-12-02" lims:enacted-date="2019-12-02" lims:fid="1206634" lims:id="1206634"><row rowsep="0"><entry colsep="0" nameend="COLSPEC0" namest="1" rowsep="0" valign="top"><SignatureBlock justification="center" width="20pc"><SignatureTitle justification="center"><Language xml:lang="fr">La chef du personnel et secrétaire générale de la Régie canadienne de l’énergie,</Language></SignatureTitle><SignatureLine justification="center" topmarginspacing="30"><Leader leader="solid" length="20pc" /></SignatureLine><SignatureName justification="center">Katherine Murphy</SignatureName><SignatureTitle justification="center">Chief of Staff and Corporate Secretary, Canadian Energy Regulator</SignatureTitle></SignatureBlock></entry></row></tbody></tgroup></table></TableGroup></Provision></Order><Body lims:inforce-start-date="2019-12-02" lims:enacted-date="2019-12-02" lims:fid="1206635" lims:id="1206635"><Heading lims:inforce-start-date="2019-12-02" lims:enacted-date="2019-12-02" lims:fid="1206636" lims:id="1206636" level="1"><TitleText>Interpretation</TitleText></Heading><Section lims:inforce-start-date="2020-03-16" lims:enacted-date="2019-12-02" lims:lastAmendedDate="2020-03-16" lims:fid="1206637" lims:id="1206637"><MarginalNote lims:inforce-start-date="2020-03-16" lims:enacted-date="2019-12-02" lims:fid="1206638" lims:id="1206638">Definitions</MarginalNote><Label>1</Label><Subsection lims:inforce-start-date="2020-03-16" lims:enacted-date="2019-12-02" lims:fid="1206639" lims:id="1206639"><Label>(1)</Label><Text>The following definitions apply in these Regulations.</Text><Definition lims:inforce-start-date="2020-03-16" lims:enacted-date="2019-12-02" lims:fid="1206640" lims:id="1206640"><Text><DefinedTermEn>Act</DefinedTermEn> means the <XRefExternal reference-type="act" link="C-15.1">Canadian Energy Regulator Act</XRefExternal>. (<DefinedTermFr>Loi</DefinedTermFr>)</Text></Definition><Definition lims:inforce-start-date="2020-03-16" lims:enacted-date="2019-12-02" lims:fid="1206641" lims:id="1206641"><Text><DefinedTermEn>authorization</DefinedTermEn> means an authorization referred to in paragraph 275(3)(b) of the Act. (<DefinedTermFr>autorisation</DefinedTermFr>)</Text></Definition><Definition lims:inforce-start-date="2020-03-16" lims:enacted-date="2019-12-02" lims:fid="1206642" lims:id="1206642"><Text><DefinedTermEn>holder</DefinedTermEn> means the holder of a permit or certificate issued under Part 4 of the Act in respect of an international or interprovincial power line. (<DefinedTermFr>titulaire</DefinedTermFr>)</Text></Definition><Definition lims:inforce-start-date="2020-03-16" lims:enacted-date="2019-12-02" lims:fid="1206643" lims:id="1206643"><Text><DefinedTermEn>international or interprovincial power line</DefinedTermEn> means a facility referred to in subsection 271(1) of the Act. (<DefinedTermFr>ligne internationale ou interprovinciale</DefinedTermFr>)</Text></Definition><Definition lims:inforce-start-date="2020-03-16" lims:enacted-date="2019-12-02" lims:fid="1206644" lims:id="1206644"><Text><DefinedTermEn>working day</DefinedTermEn> means any day that is not a Saturday or a holiday. (<DefinedTermFr>jour ouvrable</DefinedTermFr>)</Text></Definition></Subsection><Subsection lims:inforce-start-date="2020-03-16" lims:enacted-date="2019-12-02" lims:fid="1206645" lims:id="1206645"><MarginalNote lims:inforce-start-date="2020-03-16" lims:enacted-date="2019-12-02" lims:fid="1206646" lims:id="1206646">Interpretation of Documents</MarginalNote><Label>(2)</Label><Text>In these Regulations, if a document that is available in both official languages is incorporated by reference as amended from time to time, any amendment to that document is incorporated only when the amendment is available in both official languages.</Text></Subsection></Section><Heading lims:inforce-start-date="2019-12-02" lims:enacted-date="2019-12-02" lims:fid="1206647" lims:id="1206647" level="1"><TitleText>Prescribed Area</TitleText></Heading><Section lims:inforce-start-date="2020-03-16" lims:enacted-date="2019-12-02" lims:lastAmendedDate="2020-03-16" lims:fid="1206648" lims:id="1206648"><MarginalNote lims:inforce-start-date="2020-03-16" lims:enacted-date="2019-12-02" lims:fid="1206649" lims:id="1206649">Prescribed area</MarginalNote><Label>2</Label><Subsection lims:inforce-start-date="2020-03-16" lims:enacted-date="2019-12-02" lims:fid="1206650" lims:id="1206650"><Label>(1)</Label><Text>For the purposes of subsection 273(1) of the Act, the prescribed area means the strip of land on which an international or interprovincial power line is located and that corresponds to the right of way of that line.</Text></Subsection><Subsection lims:inforce-start-date="2020-03-16" lims:enacted-date="2019-12-02" lims:fid="1206651" lims:id="1206651"><MarginalNote lims:inforce-start-date="2020-03-16" lims:enacted-date="2019-12-02" lims:fid="1206652" lims:id="1206652">Right of way</MarginalNote><Label>(2)</Label><Text>The right of way is the land registered or recorded as the right of way in the land registry office or other office where title to land is registered for the locality in which that land is situated.</Text></Subsection><Subsection lims:inforce-start-date="2020-03-16" lims:enacted-date="2019-12-02" lims:fid="1206653" lims:id="1206653"><MarginalNote lims:inforce-start-date="2020-03-16" lims:enacted-date="2019-12-02" lims:fid="1206654" lims:id="1206654">Absence of right of way</MarginalNote><Label>(3)</Label><Text>If there is no right of way for the international or interprovincial power line, the prescribed area is the strip of land 30 m on each side from the centre of the line.</Text></Subsection></Section><Heading lims:inforce-start-date="2019-12-02" lims:enacted-date="2019-12-02" lims:fid="1206655" lims:id="1206655" level="1"><TitleText>Ground Disturbance — Specified Activities</TitleText></Heading><Section lims:inforce-start-date="2020-03-16" lims:enacted-date="2019-12-02" lims:lastAmendedDate="2020-03-16" lims:fid="1206656" lims:id="1206656"><MarginalNote lims:inforce-start-date="2020-03-16" lims:enacted-date="2019-12-02" lims:fid="1206657" lims:id="1206657">Activities not included</MarginalNote><Label>3</Label><Text>For the purposes of paragraph (a) of the definition <DefinitionRef>ground disturbance</DefinitionRef> in section 2 of the Act, in respect of an international or interprovincial power line, the following activities are specified:</Text><Paragraph lims:inforce-start-date="2020-03-16" lims:enacted-date="2019-12-02" lims:fid="1206658" lims:id="1206658"><Label>(a)</Label><Text>cultivation to a depth of less than 45 cm below the surface of the ground; or</Text></Paragraph><Paragraph lims:inforce-start-date="2020-03-16" lims:enacted-date="2019-12-02" lims:fid="1206659" lims:id="1206659"><Label>(b)</Label><Text>any other activity to a depth of less than 30 cm and that does not result in a reduction of the earth cover over any underground portion of a line.</Text></Paragraph></Section><Heading lims:inforce-start-date="2019-12-02" lims:enacted-date="2019-12-02" lims:fid="1206660" lims:id="1206660" level="1"><TitleText>Ground Disturbance — Temporary Prohibition</TitleText></Heading><Section lims:inforce-start-date="2020-03-16" lims:enacted-date="2019-12-02" lims:lastAmendedDate="2020-03-16" lims:fid="1206661" lims:id="1206661"><MarginalNote lims:inforce-start-date="2020-03-16" lims:enacted-date="2019-12-02" lims:fid="1206662" lims:id="1206662">Prohibition</MarginalNote><Label>4</Label><Text>If the holder, after having received a locate request from a person that intends to engage in an activity that causes a ground disturbance within a prescribed area, indicates an area that is situated in the vicinity of an international or interprovincial power line and that may extend beyond the prescribed area, the ground disturbance is prohibited within that area during the period referred to in subsection 276(1) of the Act.</Text></Section><Heading lims:inforce-start-date="2019-12-02" lims:enacted-date="2019-12-02" lims:fid="1206663" lims:id="1206663" level="1"><TitleText>General Provisions</TitleText></Heading><Section lims:inforce-start-date="2020-03-16" lims:enacted-date="2019-12-02" lims:lastAmendedDate="2020-03-16" lims:fid="1206664" lims:id="1206664"><MarginalNote lims:inforce-start-date="2020-03-16" lims:enacted-date="2019-12-02" lims:fid="1206665" lims:id="1206665">Locate request — timing</MarginalNote><Label>5</Label><Subsection lims:inforce-start-date="2020-03-16" lims:enacted-date="2019-12-02" lims:fid="1206666" lims:id="1206666"><Label>(1)</Label><Text>A person that intends to construct a facility across, on, along or under an international or interprovincial power line or engage in an activity that causes a ground disturbance within a prescribed area, must make a locate request at least three working days before the day on which the construction or activity is to start.</Text></Subsection><Subsection lims:inforce-start-date="2020-03-16" lims:enacted-date="2019-12-02" lims:fid="1206667" lims:id="1206667"><MarginalNote lims:inforce-start-date="2020-03-16" lims:enacted-date="2019-12-02" lims:fid="1206668" lims:id="1206668">Locate request — making</MarginalNote><Label>(2)</Label><Text>The locate request must be made to a one-call centre if there is one within the area where the intended construction or activity takes place and if there is none in the area, to the holder directly.</Text></Subsection><Subsection lims:inforce-start-date="2020-03-16" lims:enacted-date="2019-12-02" lims:fid="1206669" lims:id="1206669"><MarginalNote lims:inforce-start-date="2020-03-16" lims:enacted-date="2019-12-02" lims:fid="1206670" lims:id="1206670">Emergency</MarginalNote><Label>(3)</Label><Text>In the case of an unexpected situation that could endanger life or cause substantial property or environmental damage and that requires immediate action, the period set out in subsection (1) does not apply and the locate request must be made as soon as possible before the construction or activity starts.</Text></Subsection><Subsection lims:inforce-start-date="2020-03-16" lims:enacted-date="2019-12-02" lims:fid="1206671" lims:id="1206671"><MarginalNote lims:inforce-start-date="2020-03-16" lims:enacted-date="2019-12-02" lims:fid="1206672" lims:id="1206672">One-call centre</MarginalNote><Label>(4)</Label><Text>A one-call centre is an organization that, for the purposes of protecting the underground infrastructures of its members from damage and ensuring public safety,</Text><Paragraph lims:inforce-start-date="2020-03-16" lims:enacted-date="2019-12-02" lims:fid="1206673" lims:id="1206673"><Label>(a)</Label><Text>receives locate requests from persons within a defined geographical area; and</Text></Paragraph><Paragraph lims:inforce-start-date="2020-03-16" lims:enacted-date="2019-12-02" lims:fid="1206674" lims:id="1206674"><Label>(b)</Label><Text>notifies its members that may be affected by any proposed construction or by any proposed activity that would cause a ground disturbance, if that construction or activity is the subject of a locate request.</Text></Paragraph></Subsection></Section><Section lims:inforce-start-date="2020-03-16" lims:enacted-date="2019-12-02" lims:lastAmendedDate="2020-03-16" lims:fid="1206675" lims:id="1206675"><MarginalNote lims:inforce-start-date="2020-03-16" lims:enacted-date="2019-12-02" lims:fid="1206676" lims:id="1206676">Duty to inform</MarginalNote><Label>6</Label><Text>Any person that intends to construct a facility across, on, along or under an international or interprovincial power line, engage in an activity that would cause a ground disturbance within a prescribed area or operate a vehicle or mobile equipment across an international or interprovincial power line must, before the construction, activity or operation is to start, inform all persons working on their behalf, including contractors and subcontractors, of the obligations under these Regulations.</Text></Section><Heading lims:inforce-start-date="2019-12-02" lims:enacted-date="2019-12-02" lims:fid="1206677" lims:id="1206677" level="1"><TitleText>Authorizations</TitleText></Heading><Section lims:inforce-start-date="2020-03-16" lims:enacted-date="2019-12-02" lims:lastAmendedDate="2020-03-16" lims:fid="1206678" lims:id="1206678"><MarginalNote lims:inforce-start-date="2020-03-16" lims:enacted-date="2019-12-02" lims:fid="1206679" lims:id="1206679">Construction of facility</MarginalNote><Label>7</Label><Subsection lims:inforce-start-date="2020-03-16" lims:enacted-date="2019-12-02" lims:fid="1206680" lims:id="1206680"><Label>(1)</Label><Text>The construction of a facility — in an area other than an offshore area — across, on, along or under an international or interprovincial power line is authorized if the person that intends to construct the facility</Text><Paragraph lims:inforce-start-date="2020-03-16" lims:enacted-date="2019-12-02" lims:fid="1206681" lims:id="1206681"><Label>(a)</Label><Text>obtains written authorization from the holder;</Text></Paragraph><Paragraph lims:inforce-start-date="2020-03-16" lims:enacted-date="2019-12-02" lims:fid="1206682" lims:id="1206682"><Label>(b)</Label><Text>agrees with the holder in writing to a procedure and schedule for the work;</Text></Paragraph><Paragraph lims:inforce-start-date="2020-03-16" lims:enacted-date="2019-12-02" lims:fid="1206683" lims:id="1206683"><Label>(c)</Label><Text>makes a locate request in accordance with section 5; and</Text></Paragraph><Paragraph lims:inforce-start-date="2020-03-16" lims:enacted-date="2019-12-02" lims:fid="1206684" lims:id="1206684"><Label>(d)</Label><Text>meets the following requirements:</Text><Subparagraph lims:inforce-start-date="2020-03-16" lims:enacted-date="2019-12-02" lims:fid="1206685" lims:id="1206685"><Label>(i)</Label><Text>complies with the conditions set out in the authorization,</Text></Subparagraph><Subparagraph lims:inforce-start-date="2020-03-16" lims:enacted-date="2019-12-02" lims:fid="1206686" lims:id="1206686"><Label>(ii)</Label><Text>in respect of overhead crossings, ensures that the construction is designed and executed in accordance with CSA Group standard C22.3 No. 1, <XRefExternal reference-type="standard">Overhead systems</XRefExternal>, as amended from time to time, and</Text></Subparagraph><Subparagraph lims:inforce-start-date="2020-03-16" lims:enacted-date="2019-12-02" lims:fid="1206687" lims:id="1206687"><Label>(iii)</Label><Text>in respect of underground crossings, ensures that the construction is designed and executed in accordance with CSA Group standard C22.3 No. 7, <XRefExternal reference-type="standard">Underground systems</XRefExternal>, as amended from time to time.</Text></Subparagraph></Paragraph></Subsection><Subsection lims:inforce-start-date="2020-03-16" lims:enacted-date="2019-12-02" lims:fid="1206688" lims:id="1206688"><MarginalNote lims:inforce-start-date="2020-03-16" lims:enacted-date="2019-12-02" lims:fid="1206689" lims:id="1206689">Suspension</MarginalNote><Label>(2)</Label><Text>If the authorization is suspended, the construction must cease for the duration of the suspension.</Text></Subsection><Subsection lims:inforce-start-date="2020-03-16" lims:enacted-date="2019-12-02" lims:fid="1206690" lims:id="1206690"><MarginalNote lims:inforce-start-date="2020-03-16" lims:enacted-date="2019-12-02" lims:fid="1206691" lims:id="1206691">Measures</MarginalNote><Label>(3)</Label><Text>Any person that is undertaking the construction of a facility must ensure that the construction is carried out in accordance with the technical details that are set out in the person’s request for authorization and that have been accepted by the holder, as well as with the conditions set out in the holder’s authorization.</Text></Subsection></Section><Section lims:inforce-start-date="2020-03-16" lims:enacted-date="2019-12-02" lims:lastAmendedDate="2020-03-16" lims:fid="1206692" lims:id="1206692"><MarginalNote lims:inforce-start-date="2020-03-16" lims:enacted-date="2019-12-02" lims:fid="1206693" lims:id="1206693">Ground disturbance activity</MarginalNote><Label>8</Label><Subsection lims:inforce-start-date="2020-03-16" lims:enacted-date="2019-12-02" lims:fid="1206694" lims:id="1206694"><Label>(1)</Label><Text>Any activity — in an area other than an offshore area — that would cause a ground disturbance within a prescribed area is authorized if the person that intends to engage in the activity</Text><Paragraph lims:inforce-start-date="2020-03-16" lims:enacted-date="2019-12-02" lims:fid="1206695" lims:id="1206695"><Label>(a)</Label><Text>obtains written authorization from the holder;</Text></Paragraph><Paragraph lims:inforce-start-date="2020-03-16" lims:enacted-date="2019-12-02" lims:fid="1206696" lims:id="1206696"><Label>(b)</Label><Text>agrees with the holder in writing to a procedure and schedule for the work;</Text></Paragraph><Paragraph lims:inforce-start-date="2020-03-16" lims:enacted-date="2019-12-02" lims:fid="1206697" lims:id="1206697"><Label>(c)</Label><Text>makes a locate request in accordance with section 5; and</Text></Paragraph><Paragraph lims:inforce-start-date="2020-03-16" lims:enacted-date="2019-12-02" lims:fid="1206698" lims:id="1206698"><Label>(d)</Label><Text>complies with the conditions set out in the authorization.</Text></Paragraph></Subsection><Subsection lims:inforce-start-date="2020-03-16" lims:enacted-date="2019-12-02" lims:fid="1206699" lims:id="1206699"><MarginalNote lims:inforce-start-date="2020-03-16" lims:enacted-date="2019-12-02" lims:fid="1206700" lims:id="1206700">Suspension</MarginalNote><Label>(2)</Label><Text>If the authorization is suspended, the activity must cease for the duration of the suspension.</Text></Subsection><Subsection lims:inforce-start-date="2020-03-16" lims:enacted-date="2019-12-02" lims:fid="1206701" lims:id="1206701"><MarginalNote lims:inforce-start-date="2020-03-16" lims:enacted-date="2019-12-02" lims:fid="1206702" lims:id="1206702">Measures</MarginalNote><Label>(3)</Label><Text>Any person that is engaged in an activity that causes a ground disturbance within a prescribed area must</Text><Paragraph lims:inforce-start-date="2020-03-16" lims:enacted-date="2019-12-02" lims:fid="1206703" lims:id="1206703"><Label>(a)</Label><Text>ensure that the activity is carried out in accordance with the conditions set out in the holder’s authorization;</Text></Paragraph><Paragraph lims:inforce-start-date="2020-03-16" lims:enacted-date="2019-12-02" lims:fid="1206704" lims:id="1206704"><Label>(b)</Label><Text>ensure that there is no additional earth or other material within the prescribed area that could reduce the ground to conductor clearance of the overhead line;</Text></Paragraph><Paragraph lims:inforce-start-date="2020-03-16" lims:enacted-date="2019-12-02" lims:fid="1206705" lims:id="1206705"><Label>(c)</Label><Text>immediately notify the holder of any contact with any underground portion of the holder’s international or interprovincial power line; and</Text></Paragraph><Paragraph lims:inforce-start-date="2020-03-16" lims:enacted-date="2019-12-02" lims:fid="1206706" lims:id="1206706"><Label>(d)</Label><Text>notify the holder at least 24 hours before backfilling over any underground portion of the holder’s international or interprovincial power line that is exposed, unless the holder and the person that is engaged in the activity agree otherwise.</Text></Paragraph></Subsection></Section><Section lims:inforce-start-date="2020-03-16" lims:enacted-date="2019-12-02" lims:lastAmendedDate="2020-03-16" lims:fid="1206707" lims:id="1206707"><MarginalNote lims:inforce-start-date="2020-03-16" lims:enacted-date="2019-12-02" lims:fid="1206708" lims:id="1206708">Operation across a power line</MarginalNote><Label>9</Label><Text>The operation of a vehicle or mobile equipment across an international or interprovincial power line is authorized if the person that intends to operate the vehicle or mobile equipment obtains authorization from the holder.</Text></Section><Heading lims:inforce-start-date="2019-12-02" lims:enacted-date="2019-12-02" lims:fid="1206709" lims:id="1206709" level="1"><TitleText>Circumstances</TitleText></Heading><Section lims:inforce-start-date="2020-03-16" lims:enacted-date="2019-12-02" lims:lastAmendedDate="2020-03-16" lims:fid="1206710" lims:id="1206710"><MarginalNote lims:inforce-start-date="2020-03-16" lims:enacted-date="2019-12-02" lims:fid="1206711" lims:id="1206711">Construction of international or interprovincial power line</MarginalNote><Label>10</Label><Text>For the purposes of paragraph 272(1)(c) of the Act, a person may construct an international or interprovincial power line that passes on, over, along or under a facility in the following circumstances:</Text><Paragraph lims:inforce-start-date="2020-03-16" lims:enacted-date="2019-12-02" lims:fid="1206712" lims:id="1206712"><Label>(a)</Label><Text>in respect of overhead crossings, the line is designed and constructed in accordance with CSA Group standard C22.3 No. 1, <XRefExternal reference-type="standard">Overhead systems</XRefExternal>, as amended from time to time;</Text></Paragraph><Paragraph lims:inforce-start-date="2020-03-16" lims:enacted-date="2019-12-02" lims:fid="1206713" lims:id="1206713"><Label>(b)</Label><Text>in respect of underground crossings, the line is designed and constructed in accordance with CSA Group standard C22.3 No. 7, <XRefExternal reference-type="standard">Underground systems</XRefExternal>, as amended from time to time;</Text></Paragraph><Paragraph lims:inforce-start-date="2020-03-16" lims:enacted-date="2019-12-02" lims:fid="1206714" lims:id="1206714"><Label>(c)</Label><Text>the line does not extend beyond any terminal of that line;</Text></Paragraph><Paragraph lims:inforce-start-date="2020-03-16" lims:enacted-date="2019-12-02" lims:fid="1206715" lims:id="1206715"><Label>(d)</Label><Text>the line is designed and constructed in accordance with any applicable provincial and federal legislation;</Text></Paragraph><Paragraph lims:inforce-start-date="2020-03-16" lims:enacted-date="2019-12-02" lims:fid="1206716" lims:id="1206716"><Label>(e)</Label><Text>the person obtains written permission from the owner of the facility; and</Text></Paragraph><Paragraph lims:inforce-start-date="2020-03-16" lims:enacted-date="2019-12-02" lims:fid="1206717" lims:id="1206717"><Label>(f)</Label><Text>the person and the owner of the facility agreed in writing to a construction procedure and schedule for the work.</Text></Paragraph></Section><Heading lims:inforce-start-date="2019-12-02" lims:enacted-date="2019-12-02" lims:fid="1206718" lims:id="1206718" level="1"><TitleText>Transitional Provisions</TitleText></Heading><Section lims:inforce-start-date="2020-03-16" lims:enacted-date="2019-12-02" lims:lastAmendedDate="2020-03-16" lims:fid="1206719" lims:id="1206719"><MarginalNote lims:inforce-start-date="2020-03-16" lims:enacted-date="2019-12-02" lims:fid="1206720" lims:id="1206720">Definition of <DefinitionRef>coming-into-force day</DefinitionRef></MarginalNote><Label>11</Label><Text>In sections 12 to 15, <DefinedTermEn>coming-into-force day</DefinedTermEn> means the day on which the <XRefExternal reference-type="act" link="C-15.1">Canadian Energy Regulator Act</XRefExternal> comes into force.</Text></Section><Section lims:inforce-start-date="2020-03-16" lims:enacted-date="2019-12-02" lims:lastAmendedDate="2020-03-16" lims:fid="1206721" lims:id="1206721"><MarginalNote lims:inforce-start-date="2020-03-16" lims:enacted-date="2019-12-02" lims:fid="1206722" lims:id="1206722">Leave</MarginalNote><Label>12</Label><Text>Any leave granted by the holder before the coming-into-force day, under subsection 58.31(2) of the <XRefExternal reference-type="act" link="N-7">National Energy Board Act</XRefExternal>, as it read immediately before that date, to operate a vehicle or mobile equipment across an international or interprovincial power line, remains in force until the expiry date set out in the leave.</Text></Section><Section lims:inforce-start-date="2020-03-16" lims:enacted-date="2019-12-02" lims:lastAmendedDate="2020-03-16" lims:fid="1206723" lims:id="1206723"><MarginalNote lims:inforce-start-date="2020-03-16" lims:enacted-date="2019-12-02" lims:fid="1206724" lims:id="1206724">Leave — excavation or construction of facility</MarginalNote><Label>13</Label><Text>Any excavation or the construction of a facility that was started before the coming-into-force day and for which leave of the National Energy Board was not necessary under paragraph 58.33(c) of the <XRefExternal reference-type="act" link="N-7">National Energy Board Act</XRefExternal>, as it read immediately before that day, may be continued after that day if it is carried out in conformity with the applicable conditions set out in section 3 of the <XRefExternal reference-type="regulation" link="SOR-95-500">Power Line Crossing Regulations</XRefExternal>, as it read immediately before that day.</Text></Section><Section lims:inforce-start-date="2020-03-16" lims:enacted-date="2019-12-02" lims:lastAmendedDate="2020-03-16" lims:fid="1206725" lims:id="1206725"><MarginalNote lims:inforce-start-date="2020-03-16" lims:enacted-date="2019-12-02" lims:fid="1206726" lims:id="1206726">Construction — international or interprovincial power line</MarginalNote><Label>14</Label><Text>Any construction of an international or interprovincial power line that passes on, over, along or under a facility for which leave was granted before the coming-into-force day, under subsections 58.28(1) and (4) of the <XRefExternal reference-type="act" link="N-7">National Energy Board Act</XRefExternal>, as it read immediately before that date, continues to be authorized if the construction is carried out in conformity with the applicable circumstances set out in section 4 of the <XRefExternal reference-type="regulation" link="SOR-95-500">Power Line Crossing Regulations</XRefExternal>, as it read immediately before that day.</Text></Section><Heading lims:inforce-start-date="2019-12-02" lims:enacted-date="2019-12-02" lims:fid="1206727" lims:id="1206727" level="1"><TitleText>Repeal</TitleText></Heading><Section lims:inforce-start-date="2020-03-16" lims:enacted-date="2019-12-02" lims:lastAmendedDate="2020-03-16" lims:fid="1206728" lims:id="1206728" target="SOR/95-500" type="repeal"><Label>15</Label><Text>The <XRefExternal reference-type="regulation" link="SOR-95-500">Power Line Crossing Regulations</XRefExternal><FootnoteRef idref="fn_81000-2-3619_hq_23965">1</FootnoteRef> are repealed.</Text><Footnote id="fn_81000-2-3619_hq_23965" placement="page" status="official"><Label>1</Label><Text>SOR/95-500</Text></Footnote></Section><Heading lims:inforce-start-date="2019-12-02" lims:enacted-date="2019-12-02" lims:fid="1206729" lims:id="1206729" level="1"><TitleText>Coming into Force</TitleText></Heading><Section lims:inforce-start-date="2019-12-02" lims:enacted-date="2019-12-02" lims:lastAmendedDate="2020-03-16" lims:fid="1206730" lims:id="1206730" type="transitional"><MarginalNote lims:inforce-start-date="2019-12-02" lims:enacted-date="2019-12-02" lims:fid="1206731" lims:id="1206731">S.C. 2019, c. 28, s. 10</MarginalNote><Label><FootnoteRef idref="fn_SOR-2019-347_e_transform_hq_26246">*</FootnoteRef>16</Label><Text>These Regulations come into force on the day on which the <XRefExternal reference-type="regulation" link="SOR-2020-49">International and Interprovincial Power Line Damage Prevention Regulations – Obligations of Holders of Permits and Certificates</XRefExternal> come into force, but if they are registered after that day, they come into force on the day on which they are registered.</Text><Footnote lims:inforce-start-date="2020-03-16" lims:enacted-date="2019-12-02" lims:fid="1238728" lims:id="1238941" id="fn_SOR-2019-347_e_transform_hq_26246" placement="section" status="editorial"><Label>*</Label><Text>[Note: Regulations in force March 16, 2020, <Emphasis style="italic">see</Emphasis> SOR/2020-49.]</Text></Footnote></Section></Body></Regulation>